Jobs Career Advice Signup
X

Send this job to a friend

X

Did you notice an error or suspect this job is scam? Tell us.

  • Posted: Sep 10, 2020
    Deadline: Not specified
    • @gmail.com
    • @yahoo.com
    • @outlook.com
  • Never pay for any CBT, test or assessment as part of any recruitment process. When in doubt, contact us

    In the developing world, over 4000 children die daily from diarrheal diseases caused by lack of basic sanitation. While less dire, in the developed world the prohibitive cost of infrastructure leads many rural users to resort to a common pit latrine. It doesn't have to be this way. Sanivation seeks to change the face of world sanitation. Sanivation is a ...
    Read more about this company

     

    Solid Waste Management Consultant

    Project Description

    Sanivation is interested in how Municipal Solid Waste processing plants could integrate with our fecal sludge processing plants. Specifically, there is an opportunity for a recycling facility design and build contract based in Malindi on the Kenyan coast. The project is estimated to cost around $700,000. Sanivation have good connections with the municipality and water services provider in Malindi, having previously been awarded several sanitation and health contracts.

    Sanivation have good experience in operating waste management in Kenya and extensive knowledge in providing sanitation services. However, solid waste management (SWM) is a new sector for the company. Sanivation would like to gain knowledge and experience within SWM, whilst building on our proven waste-to-value approach.

    We are looking for an experienced consultant to guide us through a new project and venture. We are looking for a consultant that is innovative and creative, that will help Sanivation grow in the waste management sector, ensuring a focus on waste-to-value approaches.

    Deliverables and Project Timeline

    The details on expected scope of work for the Malindi project are detailed in the following table. Overall success for this project would be the development, delivery and transfer of an integrated municipal solid waste + fecal sludge waste processing and recycling plant that is operationally sustainable. The timeline below is based on the assumption that the tender for the Malindi contract is likely to be released in September or October 2020. The timeline is highly likely to change as we learn more about the contract.

    Beyond this specific opportunity, Sanivation is seeking a long-term consultant, partner or full time hire to pursue and deliver on other solid waste management opportunities in Kenya.

    Table 1: Deliverables and Project timeline

    Pre-bid research, Malindi

    Sep 2020

    Analysis Of Information Already Available

    • A City-wide inclusive Sanitation report has already been completed, with a solid waste section.
    • Analysis of this information required, along with gap identification.
    • Analysis of design and build contract

    Sep 2020

    Option identification and analysis

    • Optioneering for recycling plant and other SWM services in Malindi that could integrate with Fecal Sludge management and processing, including preliminary capital and life-cycle costs

    Technical support of design and build contract, Malindi

    Oct 2020

    Tender application support

    • Cowriting the bid
    • Support in providing BOQ and cost estimates for bid

    Jan – Mar 2021

    Design support

    • Concept design support
    • Preliminary sizing and processes
    • Selection of detailed design consultants
    • Detailed design support
    • Working with external consultants to produce drawings fit for constructions

    Method of Application

    Interested and qualified? Go to Sanivation on www.linkedin.com to apply

    Build your CV for free. Download in different templates.

  • Send your application

    View All Vacancies at Sanivation Back To Home

Subscribe to Job Alert

 

Join our happy subscribers

 
 
Send your application through

GmailGmail YahoomailYahoomail